Categories
Re-strengthening and Seismic Upgrades

350 Oriental Parade

 

350 Oriental Parade

This building was re-strengthened and upgraded in 2002. The building was converted intotwo full floor apartments with a new penthouse constructed on the top floor. The work involved concrete underpinning and new foundation walls to create new large garages. The structure of the building was seismically upgraded and a new concrete structure was built to extend the building to the rear and increase the footplate for the new penthouse.